OUR UNIQUENESS


  • Equipped with brand new machinery and equipment.

  • Strict quality control for highest standard.

  • Two stage fabric inspection at grey level and after finishing.

  • Two Cochran boilers with a total capacity of 8.10 metric tons capcity.

  • An Effluent Treatment Plant (ETP) for treating the effluents generated from the dye house to ensure safe water suitable for safe enviroment.

  • A water Treatment Plant (WTP) for eliminating any mineral contents detrimental to perfect dyeing.



Trademarks & Copyright? 1998 Grameen Commiunications last modified on 05-June-2000.